Skip to content

Learn

Does adding a battery affect your Feed-in Tariff?

Eco Solar Panel Installation Company wrote this guide from Ofgem's guidance on batteries at Feed-in Tariff installations, because the rules decide how a battery has to be wired and set up.

Published · Updated · By Eco Solar Panel Installation Company

Short answer: It doesn't have to. Ofgem's guidance says your FIT generation payments continue if the generation meter only measures what the panels produce. That means the meter sits between the panels and the battery, the battery can't charge from the grid, or an approved meter is fitted. You should report the battery to your FIT supplier.

Why a battery can be a problem for a FIT

Feed-in Tariff payments are based on the generation meter, which counts the electricity your panels produce. Ofgem’s worry is that a battery could make that meter count power that didn’t come from the panels, for example electricity bought cheaply from the grid overnight, stored, and then released through the same meter.

So the rules are about the meter. Ofgem’s guidance on storage at FIT installations says generation payments continue where the generation meter only measures the output of the FIT installation. Deemed export payments continue in the same cases.

The three routes that keep your payments

Ofgem sets out three ways to meet that test.

RouteWhat it meansCan the battery charge from the grid?
Meter between panels and batteryThe generation meter sits between the panels and the battery, so it only sees solar powerYes
No grid chargingThe battery is set so it can’t charge from the grid, with a signed declarationNo
Approved bi-directional meterA meter that can tell the difference between flows is fitted, with a signed declarationYes

Whichever route applies, the guidance says adding storage should be reported to your FIT licensee, the supplier that pays your tariff.

AC-coupled and DC-coupled batteries

An AC-coupled battery has its own inverter and connects to the household wiring, after the generation meter. The meter keeps counting only what the panels make, so this is usually the simplest way to add a battery to a FIT system. It also leaves your existing solar inverter in place.

A DC-coupled battery connects on the panels’ side, usually through a hybrid inverter that replaces the old one. Depending on where the generation meter ends up, the meter may see power coming out of the battery. It can still be done, but the design has to meet one of Ofgem’s routes, and that has to be checked before anything is ordered.

Before you get quotes

Find your FIT paperwork: the supplier you are paid by, your FIT ID and the details of the generation meter. Then ask each installer:

  1. Is the battery AC-coupled or DC-coupled, and where does it sit in relation to the generation meter?
  2. Will it charge from the grid? If so, which of Ofgem’s routes allows that?
  3. Will you help with the notification and any declaration to my FIT supplier?

If you bought the house with panels already on it, check that the FIT has been transferred to you first. Buying a house with solar panels explains how.

What it costs

The Energy Saving Trust puts home batteries at £1,500 to £10,000, with a 5 kWh system around £4,600. Adding a battery to existing solar panels explains how a battery is sized and fitted to a system that is already on the roof.

Bottom line

You can usually add a battery to a Feed-in Tariff system without losing your payments, as long as it is wired and set up so the generation meter only counts solar power, and you tell your FIT supplier. Ask any installer to explain which of Ofgem's routes their design follows. Our quotes are free. Call 0121 330 1151, 9am to 7pm, 7 days.

Questions people also ask

Do I need to tell my FIT supplier if I add a battery?

Yes. Ofgem's guidance says adding storage to a FIT installation should be reported to the FIT licensee, which is the energy supplier that pays your tariff. Depending on the set-up, you may also need to sign a declaration about how the battery is connected or charged.

Is an AC-coupled or DC-coupled battery better with a Feed-in Tariff?

An AC-coupled battery connects on the household side of the generation meter, so the meter still only counts power from the panels. That makes it the simpler route for most FIT systems. A DC-coupled battery can work too, but only with a meter arrangement that meets Ofgem's rules.

Can a battery on a FIT system charge from the grid on a cheap tariff?

Only if the generation meter can't count that grid power as solar. Ofgem's guidance allows grid charging where the meter sits between the panels and the battery, or where an approved bi-directional meter is fitted. Otherwise the battery must be set so it can't charge from the grid.

Get a free quote for a battery on your FIT system

Two quick steps. We reply within opening hours.

Step 1 of 2: the job
Step 2 of 2: how to reach you

We reply Monday to Sunday, 9am to 7pm. Your details are used only to answer this request. See our privacy notice.

Call 0121 330 1151